THIRD VISION LTD. / Institutional · Library
MIST Central Library
A library interior that connects a dramatic entrance with reading spaces, warm timber, and a sculptural central stair.

- Project type
- Institutional · Library
- Project duration
- 3 months
- Project date
- 1 October 2022
- Scope
- Interior Design
01 / PROJECT OVERVIEW
Design in detail.
The gallery brings together the entrance identity, open reading areas, double-height space, and ceiling details.
Discuss a similar project 02 / VISUAL STUDY · 5 IMAGES
Inside the project.
MIST Central Library · 01MIST Central Library · 02MIST Central Library · 03MIST Central Library · 04MIST Central Library · 05 Project photographs and details from Third Vision’s original project archive.